Module 7 Template

Link to Student
Submitted For
Module 7 - Comfort Zone

Note on model setup

My models will not link correctly, and office hours could not fix it over two weeks. Saving to the cloud often fails with a permission error, cloud linking says I have no access to cloud models, and local links land at the wrong position and elevation under every positioning option. To complete the tasks anyway, I built the mechanical model from a copy of my architectural model. The copy keeps the same shared coordinates, levels, grids, and true north, so every mechanical element sits where it would in a linked setup, and my spaces, loads, and ducts all read the real envelope. Clash detection still works by uploading the models to Forma, since the coordinates match.

Working links to all three models in Forma Data Management and your Forma Board

https://acc.autodesk.com/docs/files/projects/44ee68f0-3782-4cbd-b6c0-af2ff94ead94?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.sEOk2CX8QdOXHGecNutjSA&viewModel=detail&moduleId=folders

PDF sheet set at E1 size, 30 by 42 inches

crowley-building-mech-cloud.pdf1.8 MiB

Load summary table: floor total and by zone

Zone
Area (SF)
Peak cooling (Btu/h)
Peak heating (Btu/h)
Heating (Btu/h·SF)
Supply airflow (CFM)
L1 101 S
326
3,666
2,261
6.95
170
L1 101 E
322
2,506
1,815
5.64
116
L1 102 E
322
2,518
1,768
5.50
117
L1 111 SW
695
5,627
2,715
3.90
260
L1 112 W
386
4,968
1,320
3.42
230
L1 112 N
800
6,476
2,320
2.90
300
L1 105 S
663
4,885
957
1.44
226
L1 103 S
906
6,288
1,284
1.42
291
L1 104 N
828
6,205
1,074
1.30
287
L1 109 S
663
3,485
864
1.30
161
L1 102 N
326
1,881
392
1.20
87
L1 107 S
1,004
6,663
1,189
1.18
308
L1 106 N
663
5,061
722
1.09
234
L1 108 N
1,004
7,203
1,034
1.03
333
L1 110 N
663
4,379
667
1.01
203
L1 111 NW
516
3,535
389
0.75
164
L1 CORRIDOR
1,525
14,681
874
0.57
680
Floor total (B01-L01)
11,612
90,026 (7.5 tons)
21,643
1.86
4,167

Source: Revit Systems Analysis (HVAC Systems Loads and Sizing), Berkeley/Oakland weather. Supply airflow = peak cooling ÷ 21.6 (20°F supply-air ΔT).

Alternatives comparison: your representative unit and your alternative unit, compared by numbers, with your conclusion

Alternatives comparison: unit 108 vs. unit 107

Same 2BR layout and orientation pair, twins across the corridor. One variable: fan coil location.

Metric
108: fan coil in unit (representative)
107: fan coil in corridor ceiling (alternative)
Supply airflow
333 CFM
308 CFM
Total supply duct length
68 ft
66 ft
Largest duct after sizing
10×8
10×8
Highest trunk velocity
599 FPM
554 FPM
Highest branch velocity
444 FPM
412 FPM
Clear height at unit entry
8'-0" ceiling
8'-0" ceiling
Clear height in corridor
10'-5¼" to slab
8'-4½" under fan coil
Ducts crossing the rated corridor wall
0
2 (supply + return)
Refrigerant line set (via shaft)
≈175 ft
≈190 ft
Maintenance access
Inside tenant unit
From corridor, no tenant entry

Conclusion: Keep the fan coil inside the unit. Both options need the same duct sizes and length, but the corridor option puts two ducts through the rated corridor wall (each needing a fire/smoke damper), drops corridor clearance by about 2 ft, and lengthens the refrigerant run; its only advantage is service access without entering the apartment.

Design memo of 300 to 500 words: your strategy and why, what the loads told you about your envelope, where your structure got in the way, and what you left unresolved

Strategy and why. My Berkeley site sits in a marine Mediterranean climate. Oakland weather data puts afternoon highs between the mid-50s in winter and about 70°F in late summer, and only 1 percent of hours exceed 79°F [Clima, Oakland station]. So I cut loads first: a 32 percent window-to-wall ratio, balconies that shade the windows below, and an insulated wood-frame envelope. Tenants open windows in mild weather. When smoke, noise, or cold keep them shut, an in-unit balanced ERV supplies filtered outdoor air. In-unit ducted heat pumps with roof condensers handle heating and occasional cooling, and each tenant pays for their own energy. Apartments form one zone each, and corner units split by orientation. My strategy placed each air handler in a closet; the model moved it above the entry ceiling to shorten the return run.

Typical floor. I modeled BLDG1 Floor 1 because it holds my furnished unit (112) and its layout matches Floors 2 through 7. Conditioned retail sits below, so the slab loses no heat at design conditions.

What the loads told me. Systems Analysis puts the floor at 90,026 Btu/h of cooling (7.5 tons) and 21,643 Btu/h of heating, with 4,167 CFM of supply air across 11,612 SF. Cooling outweighs heating four to one, which confirms that internal gains drive this climate. Corner halves with two exterior walls lose 3 to 7 Btu/h·SF in heating; mid-bar units lose about 1. Unit 101-S, the worst zone, loses 6.95 Btu/h·SF. I reviewed Revit’s defaults: they assumed 9 people in a two-bedroom unit, where I set 3 (bedrooms plus one), and office lighting at 1.10 W/ft², which I cut to 0.60. Every unit’s load airflow exceeds its ventilation minimum several times over, so the ERV only handles fresh air.

Where the structure got in the way. The plenum gives 2'-3" between the 8'-0" ceiling and the 6¾" slab. I hung the fan coils 2" above the ceiling and ran 10×8 trunks at a 9'-4" centerline. The model shows no joists. Real wood joists would leave about 12 inches, forcing the trunk into the corridor soffit my strategy already planned for.

Alternative. I compared twin units 108 and 107 with one variable: fan coil location. Both need about 67 feet of supply duct at the same sizes. Moving 107’s fan coil into the corridor puts two ducts through the rated corridor wall, drops corridor clearance from 10'-5" to 8'-4½", and lengthens the refrigerant run. I keep the fan coil inside the unit.

What I left unresolved. Refrigerant runs of 125 to 190 feet exceed typical split-system limits, so the condensers should cluster beside the mechanical shaft. That clustering sharpens my open question of how condensers and code-required solar panels share the roof. I also left fire and smoke dampers at the corridor wall, condensate piping, door undercuts for 112’s bedrooms, the ERV and its facade ducts, return flex runs of 6 to 9 feet, and ductwork for the other nine units. The lobby and retail zones fall outside this floor.