Module 7 Template

Submitted For
Module 7 - Comfort Zone

Working links to all three models in Forma Data Management and your Forma Board

Forma board:

Mechanical model:

Structural model:

Architectural model:

PDF sheet set at E1 size, 30 by 42 inches

Load summary table: floor total and by zone

Zone
Type
Floor area (sf)
People
Cooling, sensible (Btu/h)
Heating (Btu/h)
Supply air (CFM)
Outdoor air (CFM)
L1 101 (lobby)
Lobby
1,587
224
62,851
7,524
2,872
1,215
L1 105 (S)
Retail
1,935
27
25,384
11,807
1,156
390
L1 106 (W)
Retail
1,940
29
28,131
9,247
1,281
450
L1 107 (N)
Retail
1,397
21
20,332
6,781
926
325
L1 108 (N)
Retail
1,108
17
16,223
5,332
739
260
L1 109 (N)
Retail
1,495
24
21,858
6,612
995
359
L1 110 (E)
Retail
1,551
23
22,416
7,334
1,021
359
L1 111 (E)
Retail
1,384
22
20,282
6,510
924
331
L1 112 (S)
Retail
946
14
13,746
4,943
626
218
L1 113 (W)
Retail
1,078
17
16,221
7,261
739
257
L1 114 (lobby)
Lobby
580
82
23,287
3,511
1,064
445
L01 total (11 zones)
15,003
500
270,732
76,861
12,343
4,610
L2 200 (SW + W)
Corner unit
531
4
4,421
3,125
201
52
L2 201 (E + SE)
Corner unit
552
4
4,438
2,399
202
53
L2 202 (SW + W)
Corner unit
637
4
5,057
3,222
230
58
L2 203 (S)
Unit
433
3
3,321
1,156
151
41
L2 204 (S)
Unit
434
3
3,317
1,178
151
41
L2 205 (S)
Unit
505
2
3,526
1,424
160
40
L2 206 (E + SE)
Corner unit
641
4
4,954
2,494
225
58
L2 207 (E)
Unit
598
3
4,365
1,483
199
51
L2 208 (E)
Unit
903
5
6,633
2,533
302
79
L2 209 (E)
Unit
596
3
4,292
1,553
195
51
L2 210 (N + NE)
Corner unit
1,306
7
9,721
4,517
443
113
L2 211 (N, alternative)
Unit
918
4
6,409
1,904
292
75
L2 212 (N, base case)
Unit
914
4
6,405
2,077
292
75
L2 213 (N + NW, multi-zone)
Corner unit
1,531
9
12,222
5,546
556
137
L2 214 (W)
Unit
912
5
6,770
2,456
308
80
L2 215 (W)
Unit
661
3
4,710
1,819
214
55
L2 216 (W)
Unit
838
4
5,900
1,691
269
70
L02 total (17 zones, 23 System-Zones)
12,909
71
96,459
40,576
4,392
1,130
L01 + L02 total (28 zones, 34 System-Zones)
27,912
571
367,191
117,438
16,735
5,740

Alternatives comparison: your representative unit and your alternative unit, compared by numbers, with your conclusion

Please paste your two alternatives comparison here, what differs between them, and which you choose and why…

Unit 212 is the representative standard unit. Unit 211, its mirror-image neighbor, tests the same fan coil moved out to the corridor.

Metric
Unit 212: in-unit fan coil (representative)
Unit 211: corridor fan coil (alternative)
Unit
2-BD, 883 sf, north facade
2-BD, 878 sf, mirror image of 212
Peak cooling (sensible)
6,405 Btu/h
6,409 Btu/h
Peak heating
2,077 Btu/h
1,904 Btu/h
Supply / outdoor air (design)
291 / 75 CFM
291 / 75 CFM
Fan coil
300 CFM, 9 MBH, in the unit's ceiling plenum by the entry
300 CFM, 9 MBH, in the corridor drop ceiling outside the unit door
Duct + flex length (supply + return)
35 ft
45 ft
Supply trunk and highest velocity
12x6, 582 FPM
12x6, 583 FPM
Diffusers
3, at 97 CFM each
3, at 97 CFM each
Ducts through the 2-hour corridor wall
0
2, each with a fire/smoke damper
Corridor ceiling height
9'-0"
About 8'-0" outside 211 (fan coil underside at 8'-1")
Unit ceiling height
9'-0"
9'-0"
Refrigerant line set (estimate)
About 80 ft
About 77 ft
Service access
Access panel inside the unit, so service needs tenant entry
From the corridor through the lay-in ceiling, no unit entry

Loads are from Systems Analysis Report 3, run with the corridors unconditioned; supply and outdoor air are the design values in the model. Duct numbers are from the model after sizing to 0.08 in. w.g. per 100 ft and 700 FPM; lengths exclude fittings and the optional ERV-212 ducts.

What differs. The two units have nearly the same loads and the same airflow, so the only real difference is where the fan coil sits, and everything else follows from that. In 212 the fan coil is in the unit's own ceiling plenum by the entry, so every duct stays inside the apartment: 35 ft of duct and flex, no ducts through the corridor wall, and 9'-0" ceilings in both the unit and the corridor. In 211 the fan coil moves to the corridor ceiling, so its supply and return have to cross the 2-hour corridor wall, each through a fire/smoke damper, and pass under the W18 girder along that wall. That adds 10 ft of duct and drops the corridor ceiling to about 8'-0". In exchange, 211 can be serviced from the corridor without entering the apartment, and its fan noise stays out of the unit. Velocities and refrigerant runs are essentially the same.

Which I chose and why. I chose the in-unit layout (212) for the standard units. It uses 22% less duct, it avoids two fire/smoke dampers that would have to be bought, wired and tested, and it keeps the corridor ceiling at full height. With the corridors now unconditioned, it also keeps the fan coil and ducts in heated space; 211's would sit in the cold corridor ceiling and need insulation. Its cost is maintenance, since servicing the fan coil means entering the apartment. That is manageable: the access panel is at the entry, and a filter-back return grille there would let tenants change filters themselves.

Design memo of 300 to 500 words: your strategy and why, what the loads told you about your envelope, where your structure got in the way, and what you left unresolved

Strategy and why. Oak Street is in California Climate Zone 3, which is mild and mostly needs heating. Climate Consultant shows only 7.8% of hours are comfortable without help, but internal heat gain and high-mass passive solar raise that to 66.6%, and cooling is only needed about 12 hours a year. So I chose a passive-first strategy: the concrete podium and cores store heat, the windows are shaded and operable, and the active system stays small. Each apartment has its own ducted heat pump fan coil in the ceiling plenum, because heat pumps heat efficiently and let each tenant control their unit. Corner units get two zones, since their two facades peak at different times. I left the corridors unconditioned because people only pass through them, and fresh air comes through heat recovery since outdoor air is cool most of the year.

What the loads told me about the envelope. Heating is driven by the envelope. Windows make up 39% of the heating peak, infiltration 20%, and exterior walls and doors about 15% each. Cooling comes almost entirely from inside (people, lights and plug loads), and the envelope barely adds to it. Corner units need almost twice the heating of a standard unit, and unit 213 loses 52% of its heat through windows on two facades. Leaving the corridors unconditioned only cut the heating peak by 12%, because the apartments now lose heat into them. Overall, my envelope priorities would be better glazing, air sealing, and insulated corridor walls and doors, while the cooling equipment can stay small.

Where the structure got in the way. The steel set the limits of the plenum. The space between the 9'-0" ceiling and the joists only fits ducts about 8 inches deep, so the trunks had to be shallow rectangles. The W18 girder along the corridor wall was the biggest problem. In the alternative (211), the fan coil's ducts had to pass under it, which dropped the corridor ceiling to about 8'-0", a main reason I chose the in-unit layout. In unit 213, two more W18 girders pushed the bedroom 2 branch into a living room bulkhead. The W18 edge girder sits in the exterior wall with only about 2 inches of ceiling space below it, so the ERV's facade ducts have to go through its web.

What I left unresolved. Systems Analysis takes occupancy from the space types, so lobby 101 is modeled with 224 people and becomes the largest load in the building, and unit 213 is overstated the same way. I need realistic people counts and a rerun before selecting equipment. The unconditioned corridors need code ventilation, and I haven't checked how cold they get in winter. The ERV's girder-web openings need the structural engineer's sign-off, and the ERV is still a placeholder. The refrigerant lines aren't modeled, and because each corner unit's zones share one heat pump in the model, I never got per-facade loads. Finally, the units outside 211–213 have diffusers but no ducts.