Module 7 - Comfort Zone

Working links to all three models in Forma Data Management and your Forma Board

https://acc.autodesk.com/docs/files/projects/2127a14c-08d8-4540-944e-d448fa128c80?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.Fh58_BbATdiMM6ZySb8liA&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3ARDZXzmhzQkKA0UvE3vtD3A&viewModel=detail&moduleId=folders

https://acc.autodesk.com/docs/files/projects/2127a14c-08d8-4540-944e-d448fa128c80?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.Fh58_BbATdiMM6ZySb8liA&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AcVQpv1GOReiId65mc60ZZw&viewModel=detail&moduleId=folders

https://acc.autodesk.com/docs/files/projects/2127a14c-08d8-4540-944e-d448fa128c80?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.43rIA96tQAqv9BxgVNVHGA&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3Ak3VUBsVZQV24hxSO0G0h-Q&viewModel=detail&moduleId=folders

PDF sheet set at E1 size, 30 by 42 inches

Please paste your PDF sheet set here…

Project3CEE120A_Module7_Mechanical.pdf1.3 MiB

Load summary table: floor total and by zone

HVAC Zone Area (SF) Cooling Load (BTU/hr) Heating Load (BTU/hr) Zone 1 - Interior 14776 73494.0 18707.0 Zone 2 - Sunny Perimeter 12692 164426.6 63845.3 Zone 3 - Shaded Perimeter 3921 59842.9 43535.1 Floor Total 31389 297763.5 126087.4 Total Cooling Capacity Equivalent: 24.81 tons

Alternatives comparison: your representative unit and your alternative unit, compared by numbers, with your conclusion

HVAC Alternative Comparison

I compared the original HVAC arrangement with an alternative that relocates the air-handling unit closer to the supply air terminals in another unit of the same type.

Design characteristic
Original layout
Alternative layout
Estimated supply duct length
80 ft
60 ft
Assumed main duct dimensions
12 × 16 in
12 × 16 in
Estimated duct length reduction
—
25%
Air-handler placement
Farther from supply terminals
Closer to supply terminals

Conclusion: I would choose the alternative layout because the shorter duct route could reduce duct material, installation complexity, and pressure losses. It could also simplify coordination with the structural framing. These figures are preliminary design assumptions rather than verified Revit measurements, and the final selection would require checking ceiling clearance, service access, and actual duct routing.

Design memo of 300 to 500 words: your strategy and why, what the loads told you about your envelope, where your structure got in the way, and what you left unresolved

For Module 7, I developed an HVAC system for a typical floor of my building. Since the project is located in the Bay Area, where the climate is generally mild, my strategy focuses on providing heating and cooling efficiently while reducing unnecessary mechanical energy use. Natural ventilation, nighttime cooling, and exterior shading could help reduce cooling demand when outdoor conditions are appropriate. The mechanical system would provide additional heating and cooling when passive strategies are insufficient.

I selected a typical floor because it represents the repeated layout of the building and provides a consistent basis for analyzing the heating and cooling requirements. I created a separate mechanical Revit model linked to the architectural and structural models. I then placed spaces throughout the conditioned areas and organized them into three HVAC zones based on their thermal characteristics: interior, sunny perimeter, and shaded perimeter.

The calculated total cooling load for the floor was approximately 297,764 BTU/hr, equivalent to 24.81 tons of cooling. The total heating load was approximately 126,087 BTU/hr. The sunny perimeter had the highest cooling load at 164,427 BTU/hr, followed by the interior at 73,494 BTU/hr and the shaded perimeter at 59,843 BTU/hr. These results demonstrated how solar exposure, glazing, and building-envelope decisions influence mechanical loads. The sunny perimeter also had a higher cooling demand per square foot than the shaded perimeter, emphasizing the importance of facade orientation and shading.

For the air distribution system, I modeled air-handling units, supply and return ducts, air terminals, and zone controllers. The duct layout had to account for the structural framing and available ceiling space. Beams and other structural elements restricted potential duct routes, so the mechanical system required coordination with the building structure.

I also explored an alternative air-handler arrangement in another unit to evaluate whether changing equipment location could simplify the duct distribution. The preliminary comparison suggested that placing the air handler closer to the supply terminals could reduce duct length and potentially improve installation efficiency.

Several details remain unresolved, including final equipment selection, airflow balancing, and verification of some duct connections. These would require additional engineering coordination. Overall, this exercise helped demonstrate how architectural decisions affect HVAC loads and how mechanical systems must be coordinated with the structure.