Working links to all three models in Forma Data Management and your Forma Board
PDF sheet set at E1 size, 30 by 42 inches
Load summary table: floor total and by zone

Alternatives comparison: your representative unit and your alternative unit, compared by numbers, with your conclusion
Metric | Representative unit (207, fan coil in unit) | Alternative unit (209, fan coil in corridor) |
Total duct length | 19'-10" | 24'-0" |
Largest duct size after sizing | 5" x 5" | 5" x 5" |
Highest branch velocity | 454 FPM | 378 FPM |
Clear height at the unit entry, from the section | 8'-0" ceiling; fan coil above it, bottom at 8'-4" | 8'-0" ceiling; no fan coil above the entry |
Clear height in the corridor, from the section | Corridor ceiling unaffected | Fan coil in corridor plenum, bottom at 8'-4" |
Ducts crossing the rated corridor wall | 0 | 2 (supply and return), each needing a fire damper |
Refrigerant line set length | 107'-8" (52'-3" rise + 55'-5" run) | 93'-3" (52'-3" rise + 41'-0" run) |
Maintenance access | From inside the unit; the tenant must provide entry | From the corridor ceiling; no unit entry needed, but a corridor access panel is required |
Conclusion: The in-unit fan coil (207) is the better choice because it has a shorter duct run (19'-10" vs 24'-0") and no penetrations of the rated corridor wall, while the corridor location (209) gains a shorter refrigerant line set (93'-3" vs 107'-8") and maintenance access without entering the unit, at the cost of two fire-rated penetrations.
Design memo of 300 to 500 words: your strategy and why, what the loads told you about your envelope, where your structure got in the way, and what you left unresolved
Menlo Park's mild, heating-dominated climate shaped our approach from the start. Solar gains and internal heat can cover much of the building's heating needs, and with so few hot hours in the year, most warm conditions can be handled with operable windows and night flushing rather than mechanical cooling. We took a passive-first approach, reducing loads with exterior shading and exposed thermal mass. The building runs in a hybrid mode and only switches to mechanical systems when passive measures are no longer enough. A balanced ERV supplies continuous fresh air while recovering energy from the exhaust, and each unit has its own ducted air-source heat pump connected to condensers on the roof. Because every unit is independent, zoning follows the unit layouts and orientation, so units with different heating and cooling needs can run on their own.
We chose Level 2 as our typical floor because it represents the floors above it, has clean unit numbering, and avoids both podium and roof effects. On this floor we developed Studio 207 as our single-zone unit, the three-bedroom Unit 212 as our two-zone unit, and Studio 209 as 207's twin with the fan coil moved into the corridor ceiling.
The loads told us a lot about our envelope. Airflow followed exposure more than size: the corner unit 212 needed about 0.22 to 0.23 CFM per square foot, while the mid-bar studios needed only about 0.14. The corner units were our worst zones because they have more exterior wall and glazing exposed to the sun. That corner penalty is why we split 212 into two zones with a control damper on each branch, and it shows that shading the exposed facades is where our envelope strategy matters most.
The structure got in the way at the corridor, where the beams left very little room in the plenum. With the ceiling at 8'-0" and the fan coil sitting at 8'-4", we had to run the trunk at an 8'-10" middle elevation. A 12-inch placeholder trunk left no room for the taps and elbows down to the diffusers, so we drew it at 8 inches, and sizing brought it down to 5 inches. Comparing 207 and 209 showed the tradeoff of moving the fan coil. Keeping it in the unit gave us a shorter duct run (19'-10" versus 24'-0") and no penetrations of the rated corridor wall. Putting it in the corridor shortened the refrigerant line (93'-3" versus 107'-8") and allowed maintenance without entering the unit, but it added two fire-rated penetrations. We kept the in-unit location as our typical.
Several things are still unresolved. We haven't modeled the refrigerant and condensate piping, even though the line sets run 93 to 125 feet up to the roof. Every duct that crosses the corridor wall will need a fire damper. The ERV ducts inside the units still need to be routed, the roof condensers need more space for airflow and service, and the other units on the floor have diffusers placed but no ductwork yet.