Module 8 Template

Submitted For
Module 8 - Wired and Plumbed
💡

Please enter the following info in the fields above:

  • Link to Student (type the first few letter of your name, then select yourself in the list of linked records)
💡

What to Submit

  1. Working links to all five models in Forma Data Management (architectural, structural, mechanical, plumbing and electrical) and your Individual Forma Board.
  2. PDF sheet set at E1 size, 30 by 42 inches, four sheets: plumbing plan, riser section showing the sanitary fall, power plan, lighting plan.
  3. Your illumination spot check result.
  4. Design memo of 300 to 500 words: where the sanitary riser went and why, what gravity forced you to change, whether your daylighting reduced your lighting load, and what you left unresolved.

Working links to all five models in Forma Data Management (architectural, structural, mechanical, plumbing and electrical) and your Individual Forma Board

Arch: https://acc.autodesk.com/docs/files/projects/88d99894-b94d-4f31-9602-85dc250435f0?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.wLXWLjBoQeqMvF52alncXw&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AED9WTvbxSqWYg0oTWPcMxg&viewModel=detail&moduleId=folders Struc: https://acc.autodesk.com/docs/files/projects/88d99894-b94d-4f31-9602-85dc250435f0?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.wLXWLjBoQeqMvF52alncXw&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3ACqORXdVPTc-bOaNNz4dG0Q&viewModel=detail&moduleId=folders Mech: https://acc.autodesk.com/docs/files/projects/88d99894-b94d-4f31-9602-85dc250435f0?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.wLXWLjBoQeqMvF52alncXw&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AzLGXmf_XR6KG8qEvORdxCA&viewModel=detail&moduleId=folders Plumbing: https://acc.autodesk.com/docs/files/projects/88d99894-b94d-4f31-9602-85dc250435f0?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.wLXWLjBoQeqMvF52alncXw&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AQ0TRYVSuT_u2oyIuElJOrA&viewModel=detail&moduleId=folders Elec: https://acc.autodesk.com/docs/files/projects/88d99894-b94d-4f31-9602-85dc250435f0?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.wLXWLjBoQeqMvF52alncXw&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3ACcWUXEI1RGu2tZUYP7zQwQ&viewModel=detail&moduleId=folders

Forma Board: https://app.autodeskforma.com/board/up_6bmgg3oiv6/board_7dce3a73-1dbe-45a5-809c-69c0c7338252?x=-10948.203577633107&y=27201.05138763833&w=41014.48747183706&h=30477.939786398423

PDF sheet set at E1 size, 30 by 42 inches, four sheets: plumbing plan, riser section showing the sanitary fall, power plan, lighting plan

KURNIAPRAMONO-Building-Week8.pdf900.1 KiB

Your illumination spot check result

image

Design memo of 300 to 500 words: where the sanitary riser went and why, what gravity forced you to change, whether your daylighting reduced your lighting load, and what you left unresolved

I piped the bathroom stack of Unit 206 (206B, 406B and 506B on L02 to L04) and did power and lighting for Unit 206 on L02.

The sanitary riser sits in the 6" demising wall between units 205 and 206, directly behind the tub, toilet and lavatory. All three fixtures back onto that wall, it repeats on every floor, and no beams come within 4 ft of it. The building's only shaft is about 140 ft away, and at ¼" per foot that run would have dropped around 3 ft into the ceilings below. The risers run hot, cold, sanitary (4") and vent (2"), with the vent nearest the toilet and lavatory. On the ground floor there is no wall at that spot, so the risers are exposed.

Gravity changed more than I expected. Each fixture needed its own tee on the riser, 1 ft apart, which pushed the drains down. The tub drain stays inside the 10¾" joist floor, but the toilet drain sits about 6" below the structure and the lavatory drain about 1'-6" below, still above the ceiling of the unit below. I also had to swap in MEP fixture families, mirror the tub so its drain faced the wet wall, and turn the lavatory around. Drains are modeled flat; a real ¼" per foot slope would lower the lavatory drain about another inch.

Daylighting did not reduce the lighting load in Revit's terms, because the calculation ignores daylight. The bathroom (71 lx) and kitchen (164 lx) started below 200 lx, so I added two downlights to each, reaching 214 and 245 lx. The living room was already at 120 lx against a 100 lx target. Installed lighting is only 288 VA, versus the 1,811 VA that 3 VA/ft² assumes. Panel LP-206 (100 A, 120/208 V) carries 4,834 VA, balanced at about 1,600 VA per phase.

Unresolved: the vents are not tied into the traps, the trunks are open stubs, there is no fire stopping or pipe sizing, and there is no building feeder, conduit, full NEC load calculation or exhaust fan power.