Please enter the following info in the fields above:
- Link to Student (type the first few letter of your name, then select yourself in the list of linked records)
What to Submit
- Working links to all five models in Forma Data Management (architectural, structural, mechanical, plumbing and electrical) and your Individual Forma Board.
- PDF sheet set at E1 size, 30 by 42 inches, four sheets: plumbing plan, riser section showing the sanitary fall, power plan, lighting plan.
- Your illumination spot check result.
- Design memo of 300 to 500 words: where the sanitary riser went and why, what gravity forced you to change, whether your daylighting reduced your lighting load, and what you left unresolved.
Working links to all five models in Forma Data Management (architectural, structural, mechanical, plumbing and electrical) and your Individual Forma Board
Forma Board (Analytical Model included here)
PDF sheet set at E1 size, 30 by 42 inches, four sheets: plumbing plan, riser section showing the sanitary fall, power plan, lighting plan
^( Combined MEP, has electric & plumbing sheets)
Your illumination spot check result
Typical Floor Plan Illumination Schedule:

Illumination Spot Check:


Design memo of 300 to 500 words: where the sanitary riser went and why, what gravity forced you to change, whether your daylighting reduced your lighting load, and what you left unresolved
I placed the sanitary stack first because it was the largest pipe. Since it was the only one that had to slope downward, I placed it on the wall the toilet backs up to, keeping the drain run as short as possible. I set the riser midway in the wall so all four pipes and their required tees clear the floor framing on every level. The bathrooms in my design are stacked on alternating floors 1, 3, and 5, but the risers run continuously from the base to the roof, so the plumbing is exposed as it passes through floors 2, 4, 6, and 7. This would need to be addressed by enclosing the risers in a chase within those spaces. Gravity forced me to change where the drains went. Since supply pipes can go anywhere, but drains must slope 1/4" per foot, the drains ended up setting the layout.

From the previous daylight analysis, it was clear that the inner façades and spaces of my building receive far less light than the exterior walls. So the inner units need more light fixtures than those on the exterior. However, the lights in the current electrical model do not have daylight dimming or photocontrol. In a further revision of this building, adding daylight-responsive controls to the perimeter rooms could help reduce lighting loads, since the inner units will be using their lights for a large majority of the time. The analytical model estimated 15.8 kVA against 11.4 kVA connected on panel LP-L01, both well within the 225 A panel.
The biggest unresolved issue is the risers that pass through the units on levels 2, 4, 6 and 7, which need a chase. Additionally, level 7 has a bathroom that is part of the alternating stack but was not piped. After doing the illumination spot check and reviewing the schedule for the entire typical floor, the lux within units 101–104 is low, so more fixtures need to be added to make these spaces brighter.