Module 8 Template

Link to Student
Submitted For
Module 8 - Wired and Plumbed
💡

Please enter the following info in the fields above:

  • Link to Student (type the first few letter of your name, then select yourself in the list of linked records)
💡

What to Submit

  1. Working links to all five models in Forma Data Management (architectural, structural, mechanical, plumbing and electrical) and your Individual Forma Board.
  2. PDF sheet set at E1 size, 30 by 42 inches, four sheets: plumbing plan, riser section showing the sanitary fall, power plan, lighting plan.
  3. Your illumination spot check result.
  4. Design memo of 300 to 500 words: where the sanitary riser went and why, what gravity forced you to change, whether your daylighting reduced your lighting load, and what you left unresolved.

Working links to all five models in Forma Data Management (architectural, structural, mechanical, plumbing and electrical) and your Individual Forma Board

AmberNowaczek-BuildingModule6.rvt (V12) - Files - Data Management

AmberNowaczek-Str.rvt (V7) - Files - Data Management

AmberNowaczekModule7Mechanical.rvt (V4) - Files - Data Management

AmberNowaczek-Module8Plumbing.rvt (V4) - Files - Data Management

AmberNowaczek-Module8Electrical.rvt (V3) - Files - Data Management

PDF sheet set at E1 size, 30 by 42 inches, four sheets: plumbing plan, riser section showing the sanitary fall, power plan, lighting plan

AmberNowaczek-Module8Electrical-combined (1).pdf399.7 KiB

Your illumination spot check result

image

My initial kitchen illumination was about 150 lx, so I added 2 additional light fixtures to get it to 217 lx. The target, according to Google, for kitchens is between 215 and 530 lx.

Design memo of 300 to 500 words: where the sanitary riser went and why, what gravity forced you to change, whether your daylighting reduced your lighting load, and what you left unresolved

Where the sanitary riser went and why: The 4" PVC sanitary riser sits inside the riser wall on its centerline directly behind the toilet. It is placed behind the toilet because the toilet's 3" drain has only about 19" between its connector and the wall, enough for one bend and one tee and no more. At the top, the riser reduces to 3" and bends straight into the toilet drain, so no capped tee is left.

What gravity forced us to change: Drains must fall toward the riser, so they have to be the lowest pipes on each level. Also, specific spacing between pipes and components was necessary to follow codes and allow everything to run as needed. These needs, told to me by Claude, forced me to move some girders and joists in my structural model and lavatories in my architectural model.

Daylighting reduces the lighting load? The apparent power of electrical analytical unit 404 is 3,411.12 VA, which is 1,321.12 VA more than the 2,090 VA total on the C102 panel schedule. This allows me to assume that the daylighting did not reduce the load, but rather that other components in the unit increased the apparent power.

Still unresolved: Sunlight is not taken into account, so the lighting loads assume no daylight contribution. Also, the drains are drawn horizontally for simplicity, whereas a slope is usually modeled. Finally, the 3,411.12 VA analytical figure and the 2,090 VA on the C102 panel schedule still need to be examined why there is such a large gap.