Module 8 Template

Submitted For
Module 8 - Wired and Plumbed
💡

Please enter the following info in the fields above:

  • Link to Student (type the first few letter of your name, then select yourself in the list of linked records)
💡

What to Submit

  1. Working links to all five models in Forma Data Management (architectural, structural, mechanical, plumbing and electrical) and your Individual Forma Board.
  2. PDF sheet set at E1 size, 30 by 42 inches, four sheets: plumbing plan, riser section showing the sanitary fall, power plan, lighting plan.
  3. Your illumination spot check result.
  4. Design memo of 300 to 500 words: where the sanitary riser went and why, what gravity forced you to change, whether your daylighting reduced your lighting load, and what you left unresolved.

Working links to all five models in Forma Data Management (architectural, structural, mechanical, plumbing and electrical) and your Individual Forma Board

PDF sheet set at E1 size, 30 by 42 inches, four sheets: plumbing plan, riser section showing the sanitary fall, power plan, lighting plan

Your illumination spot check result

image

Design memo of 300 to 500 words: where the sanitary riser went and why, what gravity forced you to change, whether your daylighting reduced your lighting load, and what you left unresolved

Where the sanitary riser went and why

I put the sanitary riser in the two-hour wall between Bathroom 1 and the kitchen in unit 213. I chose this wall because it is the only one the bathroom shares with another room that uses water, so all four risers (4" sanitary, 2" vent, 3/4" cold and hot) could go in one place. For the riser to stack, I copied unit 213’s layout up to units 316 and 411, which were open rooms before, so Bathroom 1 now lines up on L02, L03 and L04. The stack sits 6'-10" from the south end of the wall, since that spot misses the podium beams under L02 and the joists above, meaning that it can drop straight to the L01 lobby ceiling with no offsets.

What gravity forced me to change

Unlike the supply lines, drains only work if they slope down, so I had to run the branch drains in a zone below each floor and connect them to the stack under the slab. For instance, on L02 the transfer slab and deep podium beams pushed the drains 2'-9" below the floor into the lobby ceiling. On L03 and L04, they sit 1'-5" down, just above the bathroom ceiling below. I gave the toilet the most direct path to the stack, while the sink joins from the side and the tub has its own 4'-4" line. At L01, a long-sweep bend turns the stack toward the building drain.

Whether daylighting reduced my lighting load

As per the instructions in the video for this week, I designed the lighting as if there were no daylight. Fifty-five 18 W downlights (990 VA total) meet the IES target in every room at a 3'-0" workplane and 75% ceiling reflectance. However, even when taking daylight into consideration, I think it would mostly reduce the hours the lights are on, not the connected load. The unit’s area-based load is 4,520 VA (37.7 A at 120 V), and panel LP-213 has 8.2 kVA connected with 30 A on its worst phase, so the unit stays within its 100 A allocation.

What I left unresolved:

Two drains still clash with structure: the toilet drain clips an L02 podium beam by 1.6", and the sink drain runs 0.83" into a joist on L03 and L04. The stack is capped above the L04 branch instead of continuing up as a vent. I also didn’t model drain slope, since at 1/4" per foot the 8'-6" toilet line would need about 2" of fall, but there is only about 1" above the L03 and L04 ceilings. On the electrical side, the LP-213 feeder isn’t modeled (per the video for this week), my Week 7 model has no bathroom exhaust fan to power, and the panel uses the template’s three-phase 120/208 V system, although a real unit panel would be single-phase.