Module 8 Template

Submitted For
Module 8 - Wired and Plumbed

Working links to all five models in Forma Data Management (architectural, structural, mechanical, plumbing and electrical) and your Individual Forma Board

ELECTRICAL

PLUMBING

MECHANICAL

STRUCTURAL

ARCHITECTURAL

}PDF sheet set at E1 size, 30 by 42 inches, four sheets: plumbing plan, riser section showing the sanitary fall, power plan, lighting plan

Please paste your PDF sheet set here…

Week8_Plumbing_Carvajal.pdf1.1 MiB
Week8_Electrical_carvajal.pdf1.3 MiB

Your illumination spot check result

Please paste your illumination spot check result here…

image

Design memo of 300 to 500 words: where the sanitary riser went and why, what gravity forced you to change, whether your daylighting reduced your lighting load, and what you left unresolved

For the plumbing design of Unit 801-102-207, I placed the main sanitary riser inside the existing 6-inch wall that separates the bathroom (bathtub, toilet, and sink) from the kitchen sink along Grid J. I chose this wall because its 6-inch thickness gave me enough internal space to fit all the drainage, vent, and hot and cold water pipes together without changing the building structure or adding extra chases. Grouping all the wet fixtures in one shared wall also kept the horizontal pipe runs short and organized. Even though I did not have to make any structural modifications, gravity still forced me to adjust how the pipes were arranged inside the wall. Because sanitary waste pipes need a constant downward slope to drain properly, the bathtub and toilet drains had to sit at the lowest points near the bottom of the stack, while the bathroom and kitchen sinks had to connect higher up with proper venting. This meant I had to carefully coordinate the heights of the hot and cold water lines so they could pass cleanly over and around the sloped drain pipes without colliding inside the 6-inch cavity. Regarding the electrical design for this 827.30-square-foot unit, daylighting from the exterior windows did not reduce my total lighting load. Interior areas like the bathroom, hallways, and central living spaces still need full artificial lighting at night and during cloudy hours to meet safety and comfort needs. Therefore, I kept the full lighting load in my calculations rather than subtracting power for daylighting. Finally, there are two main issues I left unresolved for the next stage of the project. Although the 100 A, 208 V panelboard has enough capacity for the 5,332.11 VA total connected and demand load (14.80 A overall demand current at a 100% demand factor), an AI review of the panel data pointed out a phase imbalance, with Phase A carrying 2,963.47 VA (24.89 A) while Phase B sits at 1,260.00 VA (10.69 A) and Phase C at 1,110.00 VA (9.25 A). In the next phase, I need to balance the loads more evenly across Phases A, B, and C based on that finding and confirm the exact floor slab openings for the vertical sanitary riser with the structural team