Module 8 Template

Link to Student
Submitted For
Module 8 - Wired and Plumbed
💡

Please enter the following info in the fields above:

  • Link to Student (type the first few letter of your name, then select yourself in the list of linked records)
💡

What to Submit

  1. Working links to all five models in Forma Data Management (architectural, structural, mechanical, plumbing and electrical) and your Individual Forma Board.
  2. PDF sheet set at E1 size, 30 by 42 inches, four sheets: plumbing plan, riser section showing the sanitary fall, power plan, lighting plan.
  3. Your illumination spot check result.
  4. Design memo of 300 to 500 words: where the sanitary riser went and why, what gravity forced you to change, whether your daylighting reduced your lighting load, and what you left unresolved.

Working links to all five models in Forma Data Management (architectural, structural, mechanical, plumbing and electrical) and your Individual Forma Board

Architectural: https://acc.autodesk.com/docs/files/projects/1d0e3c7f-e9b2-4f0f-ab9c-15e0f96078e3?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.TQCy0N2fS3-vkIc5bRWeGA&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3APoP3oeuNT0GudQyKUFHl-g&viewModel=detail&moduleId=folders

Structural: https://acc.autodesk.com/docs/files/projects/1d0e3c7f-e9b2-4f0f-ab9c-15e0f96078e3?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.TQCy0N2fS3-vkIc5bRWeGA&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AZuONe6dSS_GtG0E8jm7D8A&viewModel=detail&moduleId=folders

Mechanical: https://acc.autodesk.com/docs/files/projects/1d0e3c7f-e9b2-4f0f-ab9c-15e0f96078e3?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.97yJDKOoTl-Oq-5AWANPOg&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AJE2W7vADSHuwLb0Qjxc37w&viewModel=detail&moduleId=folders

Plumbing: https://acc.autodesk.com/docs/files/projects/1d0e3c7f-e9b2-4f0f-ab9c-15e0f96078e3?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.tpHluQ9wRxuqDy8L3Mwt2A&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3A2aGQ3WF_QzOxANQD0OF7CQ&viewModel=detail&moduleId=folders

Electrical: https://acc.autodesk.com/docs/files/projects/1d0e3c7f-e9b2-4f0f-ab9c-15e0f96078e3?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.tpHluQ9wRxuqDy8L3Mwt2A&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AfACyyGbDR-eBkPdiKuYh1Q&viewModel=detail&moduleId=folders

Board: https://app.autodeskforma.com/board/up_v90qzzezgl/board_54c9b8a7-076e-406f-92fa-7bd3764d1ca4?x=38921.635789116845&y=-771.2490308407891&w=11437.333333333334&h=6076.083333333334

PDF sheet set at E1 size, 30 by 42 inches, four sheets: plumbing plan, riser section showing the sanitary fall, power plan, lighting plan

Meleski - Plumbing_Week_8.pdf1.5 MiB
E103 - Lighting Plan (30x42).pdf862.2 KiB

Your illumination spot check result

image

Design memo of 300 to 500 words: where the sanitary riser went and why, what gravity forced you to change, whether your daylighting reduced your lighting load, and what you left unresolved

I put the risers inside the wall behind the tub, toilet and sink in bathroom 312f. Bathrooms 412f and 512f are stacked right on top of it, so the risers can go up through the units easily. The sanitary riser sits between the tub and the toilet, about 3 ft from the toilet. The toilet has the biggest drain, so I wanted its line to be as short and close to the riser as possible. I put the water lines highest in the floor and the drains lowest to consider how gravity could help the design. The toilet drain drops about 15 inches below the floor and runs along the wall into the riser. The sink drain ties into the toilet line. There wasn't enough room for the 4 inch PVC fittings to tie it into the toilet line, so it got its own tee on the riser 14 inches below the toilet's. That put the tub drain about 29 inches below the floor, under the 10 inch slab. This was a piping vs. structure conflict. I also had to move the sink and tub drains farther into the room so the pipes were long enough for their fittings. At the bottom, the trunks had to be lower than the defaults so they would stay under the slab above.

For power I used one 100 A panel (LP-312) in the laundry room on 120/208 V, and it is also connected to the fan coil from Week 7. The analytical model showed 1,896 VA or about 5.3 A for the analytical load analysis. The panel schedule shows 4,295 VA, or about 12 A, once everything is circuited. For both of these values, 100 A is more than enough. For the illumination check, I picked the kitchen and measured at 3' since that is the counter height. It started out below the 215 lx minimum, so I raised each of the 6 downlights from about 1,290 lm to 1,800 lm and got 228.4 lx. That's inside the 215 to 538 lx target, but just barely. I also adjusted a few of the other lights throughout the unit to meet the other goals as well. I think my Week 4 daylighting helps lower the lighting load, but mostly in the bedroom and living room since they're closest to the balcony windows. The kitchen is the farthest from the windows, so it still needs the electric light.

There are still a few things I have that are unresolved in this project. The kitchen is only just over 215 lx. Adding another light or using brighter fixtures would give it more room. Another change I will need to make with the lighting is that the closet doesn't have a light yet, so it shows 0 lx. I also have not modeled a bathroom exhaust fan. This was mentioned in the video briefly, so if I have time, I will go back and add that.