Working links to all five models in Forma Data Management (architectural, structural, mechanical, plumbing and electrical) and your Individual Forma Board
PDF sheet set at E1 size, 30 by 42 inches, four sheets: plumbing plan, riser section showing the sanitary fall, power plan, lighting plan
Your illumination spot check result
Lighting. The A206 bathroom averages 378 lx against my stated target of 215 lx, so one fixture is enough. A207 averages about 113 lx. Its living room and bedrooms meet my targets (100 and 50 lx), but its bathrooms (76 and 89 lx), kitchen (147 lx) and laundry (106 lx) fall below my 200 lx target and would need more fixtures.
Design memo of 300 to 500 words: where the sanitary riser went and why, what gravity forced you to change, whether your daylighting reduced your lighting load, and what you left unresolved
Why two electrical systems. I could not decide which unit to wire: A206, where I set up the plumbing and HVAC, or A207, the fully furnished unit. My first A206 system also felt too thin (four receptacles, three lights, three circuits), so I built a second, fuller system in A207 and kept both, each with its own panel (PP-1 and Panel 207) and sheets.
Sanitary riser. The 4" sanitary riser sits 31" along the plumbing wall of bathroom A206-B, on the wall's centerline, between the hot (13"), cold (19") and vent (43.5") risers. It is the only wall the lavatory and tub back onto that runs straight through all three levels. I thickened it from 4.75" to 6 1/8" so a 4" pipe fits.
Piping versus structure. A 6x6 timber girder on Level 2 blocked the toilet drop, so I moved the toilets 9.35" toward the wall. Drains must be the lowest pipes in each floor (water at -3.6" and -6", drains at -11.4"), which forced the sanitary trunk to 8'-6" instead of 10'-0". The drains are modeled level, not sloped.
Daylighting. No, daylighting did not reduce the lighting load. The unit has few windows and is deep, so the kitchen sits well beyond the roughly 10-14 ft that daylight usefully reaches from a window, and there are no daylight controls, so all fixtures count at full load (432 VA in A207).
Power and demand. PP-1 (120/208 V, 100 A) carries about 1.46 kVA. Panel 207 (120/208 V, 100 A) has eight circuits: receptacles, a bathroom circuit, 24 downlights (432 VA) and the fan coil. The area-based load analysis for A207 estimates 3,634 VA, while the sum of the circuits is about 5,512 VA. Using the higher figure, that is 15.3 A at 208 V three-phase, about 15% of the rating, so 100 A is adequate.
Week 7 air handler. A junction box stands in for the fan coil in each unit: 500 VA on PP-1 circuit 3 (A206), and 1,500 VA on Panel 207 circuit 7 (A207, 13 A on a 20 A breaker). The A207 load is assumed from its 513 CFM Module 7 airflow, since the Week 7 model has no A207 fan coil.
Unresolved. The drains have no real slope. Neither panel has an upstream source. I did not run Revit's interference check. Fixtures in linked models cannot be connected, so branches end open at the fixtures. I followed the Claude play book when I did my plumbing system step by step and by the time I finished it Claude and I both realized there was a slope component that was not added. Due to time constraints I decided to move on and leave this unresolved since I wasn’t sure how long it was going to take to untangle all the python code.