Working links to the coordination space and all five published models
Coordination Space: https://acc.autodesk.com/docs/files/projects/f33d74cd-07ad-475e-a8a8-30d6964935aa?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.PXaJzVCNT9eRf99H2pSUSQ&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3ATNGNFgdeSTuNBQSuFnfz_A&viewModel=detail&moduleId=folders
Architectural Model: https://acc.autodesk.com/docs/files/projects/f33d74cd-07ad-475e-a8a8-30d6964935aa?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.PXaJzVCNT9eRf99H2pSUSQ&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3ADCKcbEyQRlmn50wV9pwqSQ&viewModel=detail&moduleId=folders
Structural Model: https://acc.autodesk.com/docs/files/projects/f33d74cd-07ad-475e-a8a8-30d6964935aa?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.PXaJzVCNT9eRf99H2pSUSQ&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AetfygBXlTWqQGspANkonxQ&viewModel=detail&moduleId=folders
Mechanical Model: https://acc.autodesk.com/docs/files/projects/f33d74cd-07ad-475e-a8a8-30d6964935aa?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.PXaJzVCNT9eRf99H2pSUSQ&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AzirdZVMNR8SUqvLDHlgyEg&viewModel=detail&moduleId=folders
Plumbing Model: https://acc.autodesk.com/docs/files/projects/f33d74cd-07ad-475e-a8a8-30d6964935aa?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.PXaJzVCNT9eRf99H2pSUSQ&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3APdPOSfuER2uWcXcd6vZd_Q&viewModel=detail&moduleId=folders
Electrical Model: https://acc.autodesk.com/docs/files/projects/f33d74cd-07ad-475e-a8a8-30d6964935aa?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.PXaJzVCNT9eRf99H2pSUSQ&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AxrjdXu-mSjSyST6gw7mIlA&viewModel=detail&moduleId=folders
Clash matrix, one page

Classified issue log with counts and rationale

Three pairs of before and after images
#1 Before

#1 After

#2 Before

#2 After

#3 Before

#3 After

Design memo of 300 to 500 words: how many clashes you found, how you triaged them, the three you fixed and why those, what you consciously accepted, and what you would have done differently in Week 4 knowing this
From the clash matrix, there was a significant number of clashes across the five models, with most of the clashes occurring between the architectural and structural models (over 200 clashes). The top few clashes for each pair of models were looked at and triaged into either a non-issue, a minor issue with a note, or a major issue that should be resolved. Non-issues were typically classified as a valid interface or penetration; for example, a lot of clashes were the result of steel joists being placed on the underside of floor slabs, or lavatories being placed on the face of the floor. These clashes were closed as valid interfaces. An example of a valid penetration were the structural steel columns going through the ceiling plenum - these were also resolved as non-issues. Major issues were identified based on the elements conflicting (i.e. structural against MEP system ducts or pipes), the impact of the clash (minor overlap vs re-routing vs safety concern) and the size of the intersection.
The three clashes that were fixed were those that were most seen in the clash report (i.e. saw many of the same type of clashes). The first clash was an intersection between the electrical system downlights and the mechanical system supply diffusers. The second clash was a more serious clash, which was an intersection between a mechanical duct and a structural column and joist. This required re-routing of the duct system around the structural column, since structural supports are typically higher priority than MEP and harder to change. The final clash was a clash with the structural walls placed around the mechanical shaft and elevator room. Since most of these clashes happened multiple times, only one clash was chosen and resolved as an example due to time constraints; ideally, all these clashes would have been resolved.
In hindsight, I would have placed my spaces differently in Week 4 after seeing all the clashes. One of my biggest issues was when I was placing the structural system, as a lot of the columns started conflicting with the architectural walls when I was laying out the grids. This became a significant issue around the elevator and mechanical shaft space, since structural columns couldn’t be placed in either of these spaces, but there also wasn’t room between the spaces to place a structural support there. This resulted in some overlap between the structural system and the architectural one. Additionally, when laying out the mechanical system, I should have placed more attention on the structural model, in addition to underlaying the architectural model, when I was placing diffusers and connecting ducts to the AHUs. Looking at the clash report, a significant number of ducts overlap with structural joists and columns in the space, and this could have been easily fixed if I had paid more attention when laying out the mechanical ducts.