Creating an Excavation in the Toposolid in your Base Site Model

Tips:

  • Use Save As… to create a copy of your Base Site Model for each building footprint:
    • Base Site Model - Footprint 1
    • Base Site Model - Footprint 2
  • Use these copies as the starting point for cutting out the excavations:
    • Base Site Model - Excavated for Footprint 1
    • Base Site Model - Excavation for Footprint 2
  • Then, relink your Shared Levels and Grids models to this excavated Base Site Models:
    • Shared Levels & Grids - Footprint 1
      • Links to Base Site Model - Excavated for Footprint 1
    • Shared Levels & Grids - Footprint 2
      • Links to Base Site Model - Excavated for Footprint 2