‣Open the Site View in the Revit Export from FormaSwitch to the Site plan viewUse Visibility Graphics to Hide the Site: Survey PointZoom to Fit‣Delete Unused LevelsCut a section thru the project site areaDelete all the levels except the Minimum Terrain Level‣Set the Elevation to be used as the Project Elevation 0Display Project Base PointMove the section view if needed to make the Project Base Point visible in the section viewSelect the Project Base PointUse the Move tool to raise the Project Base Point up to match the elevation that will be used as Project Elevation 0